A Jongia type LB agitator hangs from a mobile crane above the bridge on the sludge mixing tank at WWTP Venlo.

Jongia agitator lifted out at WWTP Venlo while mixing continued

At WWTP Venlo, one of the two Jongia agitators was lifted out of the sludge mixing tank in full, for preventive maintenance and as a proof of concept. The mixing process carried on.

In 2025, Jongia Mixing Technology supplied and installed the agitators for Waterschap Limburg’s wastewater treatment plant (RWZI) in Venlo, through civil contractor GMB. Right from the start of the project, the water board set a clear design requirement for the sludge mixing tank: the agitators must be removable from the tank.

The complete Jongia agitator, with drive, long shaft and impeller, lifted high above WWTP Venlo by a mobile crane.

Built to come out

Both agitators stand on a bridge over the tank. That bridge is built so that each agitator can be hoisted out at any time — for regular or preventive maintenance, but also in an emergency. On Tuesday, October 27, 2026, the design was put to the test: one of the agitators came out of the tank in one piece.

Redundancy built in

With two agitators, the sludge mixing tank has redundancy: when one agitator is out of service for maintenance or after a failure, the process does not come to an immediate standstill. The lift in Venlo showed exactly that.

  • Type LB-125 – built entirely in stainless steel 316L
  • Second agitator – stood still only briefly during the lift
  • Process continuity – the plant kept running with hardly any disruption
Engineers guide the drive and mounting frame of the Jongia agitator out of the bridge opening on the sludge mixing tank.
The lifted Jongia agitator is lowered to the ground at WWTP Venlo, with the treatment basins in the background.

Back in service

Once the agitator was back on the tank, Jongia carried out preventive maintenance on both agitators, including vibration checks and a check of the bearing lubrication. Both are ready to keep going until the next scheduled service.

Want to know what preventive maintenance can do for your installation? Let Jongia help you and contact: [email protected]

Contact our specialized team for all your questions

Founding Jongia at Zaailand

Jongia's History

From the moment Jongia was founded in 1937 we have been evolving structurally over the years. Learn more about our company’s history with the summary of most important moments highlighted in a timeline. 

Related News

Logo for Steinfort with the slogan "inspiring glass" on a blue background, with industrial mixing equipment and the Jongia logo for mixing technology on a white background.

Steinfort Glas chooses Jongia Mixing Technology

Meet Mr. Gerlof Reineker, general manager of Steinfort Glas in Franeker. Steinfort Glass specializes in processing flat glass for various applications. The company purchases large sheets of glass and processes them into products such as shower doors, office glazing, bus

Read More »
BiogasPlus Jongia Mixing Technology

VVTI Biogas Tilburg

VTTI Biogas Tilburg is developing a new bio-energy facility, focusing on processing organic waste. The plant is expected to produce approximately 23 million cubic metres of biogas annually. A portion of this will be converted into green gas for the

Read More »
Scroll to Top

Download
Paint & Coatings Industry Leaflet

We will send the PDF to your email address.

paint & coatings
Paint & Coatings Leaflet

Please visit our Privacy Policy to understand how we manage your data.

Download
Juice Industry Leaflet

We will send the PDF to your email address.

juice industry
Juice Industry Leaflet

Please visit our Privacy Policy to understand how we manage your data.